logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 통영지원 2018.04.24 2017가단24365
건물명도(인도)
Text

1. The Defendants are in turn indicated in the annexed drawings No. 1, 2, 3, 4, and 1, among F. 860 square meters prior to macro-si, to the Plaintiffs.

Reasons

1. According to the overall purport of Gap evidence Nos. 1 and 5 as to the cause of the claim and the entire pleadings, the plaintiffs acquired shares of 1/3 of the F. 860 square meters (hereinafter "the instant land") from February 9, 2017, respectively, and there exists a building connected each point of 60 square meters in sequence 1, 2, 3, 4, 1, and 60 square meters in the instant land. There is a building connected each point of 1, 2, 3, 4, 1, and 60 square meters in the instant land. However, there is a building connected each point of 60 square meters in the instant land (hereinafter "the instant building"). The facts occupied by the defendants, the plaintiffs can be recognized as having acquired the ownership of the instant building from G, the owner of the instant building, which is an unauthorized building, and the defendants' assertion against

According to the above facts, the defendants are obligated to deliver to the plaintiffs the building of this case on board (A) part 60 square meters and its ground, which connects each point of Annex 1, 2, 3, 4 and 1 among the land of this case, in sequence.

2. It is so decided as per Disposition by admitting the plaintiffs' claims on the grounds of the reasons.

arrow