(영문) 서울중앙지방법원 2019.08.13 2019가합504809
부당이득금
Text

1. The defendant is against the plaintiffs:

A. The “total sum” column of the cited amount sheet for each plaintiff in the annexed sheet shall be as follows.

Reasons

1. Basic facts

A. On August 17, 2001, Plaintiff A completed the registration of ownership transfer with respect to each of the shares of 1/2 out of the Gangnam-gu Seoul Special Metropolitan City J-gu 996 square meters, K 1,337 square meters, and L 924 square meters. 2) M completed the registration of ownership transfer with respect to each of the shares of 1/2 square meters out of the Gangnam-gu Seoul Special Metropolitan City J-gu 996 square meters, K 1,37 square meters, and L 924 square meters, and died on March 22, 2009, Plaintiff B, C, D, E, E, F, and G, the heir of M, on May 13, 2009.

3) On March 14, 1983, Plaintiff H completed the registration of transfer of ownership with respect to 872 square meters in Gangnam-gu Seoul N-gu, Seoul on March 14, 1983. Plaintiff I completed the registration of transfer of ownership with respect to 373 square meters in Seocho-gu, Seoul, on February 11, 1988.

(hereinafter referred to as “each land of this case” in total, and each land shall be specified as Dong and lot number). (b)

The Defendant installed two telegraph poles at a height of 14 meters on the ground of each of the instant lands for transmission, and installed special high voltage processing cables and low voltage power distribution lines connected to neighboring telegraph stations. The Defendant installed one telegraph pole at the same height on the ground of the O land and installed high voltage power distribution lines connected to neighboring telegraph stations (hereinafter collectively collectively referred to as “the instant telegraph poles and power transmission lines”). In addition, the aforementioned telegraph poles and power transmission lines are collectively referred to as “the instant telegraph poles and power transmission lines.”

2) Of each land of this case, the parts of the position corresponding to the vertical length by adding one meter within the statutory separation distance from both sides of the utility poles of this case and the power transmission lines to one meter from both sides of the utility poles of this case and their area are as listed below.

Parcel number drawings 41, 42-4, 47, 48, 2134(low voltage) 5, 6, 52,52, 521 e.g. (special pressure) 42-45, 59, 4270 K 521 e. (special pressure) 41, 42, 42, 59, 58, 413 - 413 - 49-52, 498 L (high pressure) 13-16, 38-41, 58-56, 50, 53, 534, 1318 L (high pressure) 13-16, 38-41, 58-56, 50, 53, 54, 1313.