(영문) 청주지방법원충주지원 2017.12.07 2017가단21124
손해배상(산)
Text

1. The plaintiffs' claims against the defendants are all dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. The network E became a member of F Co., Ltd. (hereinafter “F”) in January 1, 2010 due to the birth in 1979 and the head of production division was working for F Co., Ltd. (hereinafter “Defendant C”) in accordance with the exchange service contract concluded between F and Defendant C Co., Ltd. (hereinafter “Defendant C”).

B. At around 16:50 on November 19, 2016, the Deceased, at around 16:50, operated a mixture in the process of mixing the composite materials of the two-story mixing, which are installed in Defendant C, with a view to protecting the source of the composite machine from the shock and shock, with a view to operating a mixture in the process of replacing the two devices installed in a mixr, such as a knife inside the composite machine, with a view to protecting the source of the composite machine from the shock, the Deceased died due to multiple prolonged damage, etc. (hereinafter “instant accident”).

C. On June 14, 2017, the Defendants did not install safety devices, such as safety covers, etc. to prevent accidents, such as physical congestion of workers, at the mixed body checkup room installed in the Defendant C, and the employees did not prepare and place a safety work manual, which includes the safety measures to prevent accidents due to the care of the workers at the time of the commencement of the operation of the machinery, and the employees did not perform any dangerous work, such as the maintenance, repair, and replacement of the machinery, and the employees did not perform the duty to stop the operation of the relevant machinery, thereby causing the death of the deceased by negligence. The Defendants were sentenced to a fine of 7,00,000,000, and the Defendant D, the representative of the Defendant C, who was the Defendant C, was sentenced to the suspension of the execution of six months (2017dan200). The above judgment became final and conclusive on June 22, 2017.

Plaintiff

A is the deceased's spouse.

arrow