1. Of the judgment of the court of first instance, KRW 9,659,124 against each of the Defendants against each of the Defendants, as well as from November 12, 2014 to December 2015.

Reasons

. The Plaintiff operated the two erogates (hereinafter “the instant two erogates”) with the trade name “L” in the Ha and K in the Hannam-gun, Hannam-gun.

The heads of the instant two kinds of money were made by the company’s death, etc., and the Plaintiff separately operates the money shed from the two heads of the instant money to raise the money and its own money at a point 2 km away from the two locations of money.

B. The Defendants obtained permission to engage in development activities for opening access roads to detached houses on the land, other than 10 parcels, in Haan-gun, Haan-gun, Haan-gun, and Haan-gun, Haan-gun, from October 2012 to December 2012, the construction of access roads (hereinafter “the instant road”) that pass around the instant fish farms (hereinafter “the instant construction”).

C. The head of the instant two money is located at least 1.4m at the construction site and at least 4.6m.

Since the Defendants continued the instant construction, there were damages, such as the Plaintiff’s death of money, in both sides of the instant case.

During the construction of this case, the work forecast noise level by type of work (minimum to least)* Internal predicted noise level by unit of work (minimum to least) ① Existing 71 65 65 to 75 2, 73-92 to 77-86 to 72-91, 75 to 75 to 76 of the Korea Industrial Complex Corporation 71 to 7594 to 73 to 73 to 92-91 to 75 of the Korea Industrial Complex Corporation 75 to 7594 to 55 of the Korea Industrial Complex Corporation (hereinafter referred to as the "Korea Industrial Complex Corporation") to install a retaining wall and stop operation,

The minimum conditions are based on the work noise of a dump truck and dump truck noise, the maximum conditions are based on the work noise of a dump trucker and dump truck driver noise, and dump truck driver noise. The maximum conditions are based on the maximum conditions in light of the construction contents of this case.

b)inviation;

The heads of the two moneys of this case are composed of two moneys, and each of them is indicated as

Noise generated in the course of work by each type of work is almost generated inside the money shed as it is. E.

According to the noise appraisal result by the appraiserO of the first instance trial, the result of calculating the predicted noise level based on the construction equipment used for the instant construction work is as follows:

In this case.