(영문) 대구지방법원 2017.08.24 2017나305162
손해배상(기)
Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. B is the owner of the ground C’s housing in Daegu-gun District (hereinafter “instant housing”), and the Plaintiff is the husband of B.

B. On February 23, 2006, Daegu-gu District Court applied for electric consumption pursuant to the installation of a deep field boiler, which was implemented as a resident support project at the Defendant’s Daegu Branch, to the Defendant’s Seoul-gu Branch, and on February 27, 2006, filed an application with the Defendant for electric use with the Defendant, one of whom is the Defendant, as the electric consumers, and the forest control power (hereinafter “forest control power”) as the internal contractor.

C. The Cream Power, upon obtaining the Defendant’s consent, was engaged in the installation of the stove electric boiler room in the instant house, and the stoves from electric poles to the said s to the said stove boiler room.

(hereinafter “instant electrical construction”). D.

The instant house is a structure that has an in-depth electric boiler room between the two residential single-story buildings and the warehouse used as friendlys.

On March 24, 2016, at around 04:30, a fire was occurred in the rear part of the said stove electric boiler room, and the said warehouse, the heart electric boiler room, the electric boiler, the static boiler, the stoves, the 2-mags, and all other house equipment and fixtures destroyed considerably.

(hereinafter referred to as the “instant fire”). Article 27 (Supply Points) (1) of the Framework Terms and Conditions of Supply and Demand for Electricity with customers (hereinafter referred to as the “Supply Point”) shall be the connection point with one electric wire or line and customer electrical equipment.

(2) The supply and demand points shall be one point within the electric utility use place as determined by the detailed rules, and I, through consultation with customers, do so on the basis of the point nearest to one electric wire.

Article 28 (Facilities of Supply Facilities) (1) The electric lines with which one electric line is installed shall be air wires.

(2) The facilities from the Han Power Supply Facilities to the point of supply and demand shall be installed and owned by Han Power Supply Facilities.

Article 30 (Airline) (1) Electric lines and customers.

arrow