(영문) 대구지방법원포항지원 2017.07.06 2016가합238
손해배상
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is the owner of B 65 tons of a flag (hereinafter “instant flag”) who runs construction machinery rental business under the trade name of “C”.

B. The Defendant purchased the facilities (batch plan, stilo, and other military units) of the ready-mixed factory located at the D construction site that is constructed by the MaMAel Construction Co., Ltd., and performed the construction of the Defendant’s factory to move to another factory (hereinafter “instant construction”) by demolishing the facility of the above ready-mixed factory.

C. On December 31, 2015, the Plaintiff sent the Plaintiff’s 50 tons loader with the driver E at the instant construction site, and E operated the said 50 tons loader, and dismantled the batch development plan on December 31, 2015.

In addition, on January 5, 2016, January 6, 2016, and January 8, 2016, the Plaintiff sent the instant weighter to the instant construction site, along with a driver F. F. The F operated the instant weighter on January 5, 2016, and dismantled the batt facilities on January 6, 2016 and January 8, 2016.

F around 11:20 on January 8, 2016, F used the term of this case to dismantle the compact elevators with height of 21m and weight of about 9.2 tons of the above Batch site plan (hereinafter referred to as “the body of this case”) (hereinafter referred to as “the instant work”).

However, F extracted booms that are being supported by the weather engine of this case from 7.6m, and extracted boom booms of the weather engine of this case from 34 to 35m high, by putting the booms of this case into the floor, and booms the booms of this case into the top of the left, and 30§ 30§ 30 on the front of the weather. While the booms of this case were dried from the ground in the opposite direction of the weather, there was an accident that booms the booms of this case into the ground and spread the booms of this case (hereinafter “accident”).

If the background of the occurrence of the instant accident is expressed in a picture, it is as follows.

grounds for recognition.