logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 평택지원 2014.10.23 2014고단1208
산업안전보건법위반등
Text

1. Defendant A’s imprisonment for six months, Defendant B’s imprisonment for five months, and Defendant C’s fine for two million won, respectively.

Reasons

Punishment of the crime

Defendant

C A Co., Ltd. is a business owner performing the “E Corporation” undertaken in Pyeongtaek-siD from the construction of the project owner, and Defendant A is a person in charge of safety management of the said construction as the site manager of the said construction, and Defendant B is a safety manager at the said construction site.

1. On October 17, 2013, Defendant A and Defendants B, at the site of the “E Corporation,” and at the site of the arrangement recovery boiler during construction, managed and supervised the dismantling work of the temporary sets installed at the lower part of the said Defendants, under the direction of the victim F (50 years of age), etc., in order to support the said Human Track, by conducting a prior work to install a tarc (a 8m, vertical 4m, height 0.6m, weight 7t) on the layout recovery boiler during construction.

Since the above temporary sets can be dismantled only when workers enter the space between the tampline and the ground, if the temporary sets leave the tamp during the decommissioning work, the tamp is likely to cause harm to the workers in the work, and in particular, the above temporary sets are temporarily manufactured in a way that the h beam overlaps with the h beam in a state where two sn beams are not melted and are highly likely to deviate.

Therefore, in managing and supervising the handling of heavy objects as above, there was a duty of care to prepare a work plan containing safety measures to prevent risks such as electric failure and narrowness in order to prevent risks to workers, and to prevent safety accidents according to the plan.

The Defendants installed 2 sn beam beam lines higher than the temporary sn beam in advance with the support of the two separate sn beam lines, and used snicks to put the above snife the snife and let workers dismantle the temporary snife, and prepared a work plan containing safety measures, such as moving the supervisor and the work manager at the site and managing and supervising the temporary snife dismantling work, etc., at the time of the instant accident.

arrow