(영문) 청주지방법원 2018.05.15 2016가단16474
추심금
Text

The defendant shall pay 57,50,650 won to the plaintiff and 15% per annum from October 7, 2016 to the day of complete payment.

Reasons

1. Basic facts

A. According to the Cheongju District Court Decision 2014Kahap30999 against the Daesung Heavy Co., Ltd. (hereinafter referred to as the "Masung"), the Plaintiff was served on the Defendant on January 18, 2016 on the aggregate of the construction cost claims at the construction site at the construction site at the construction site at the construction site at the construction site at the construction site at the Cheongju-si, Cheongju-si, Cheongju-dong, Cheongju-dong, Maju-dong, 372-6 Masi-dong, Cheongju-dong, Cheongju-dong, Cheongju-do, 810-2, and 57,50,650 won in the total of the construction cost claims at the construction site at the construction site of the new construction site at the Cheongju-si, Cheongdong-gu, Cheongju-si, Cheongju-dong, Cheongju-do, 2016.

B. The costs of soil and sand transport and equipment of the lusium during the construction site of the lusium at the lusium at the construction site are KRW 73,49,860 in the aggregate of KRW 3,905,00 in September 1, 2015; KRW 35,795,980 in October 22, 2015; KRW 7,700 in the equipment unit for November 2015; KRW 26,048,80 in the soil and sand transport; KRW 73,49,860 in the construction site of the lusium at the lusium at the construction site; the Defendant paid the lusium at the lusium at the lusium at the lusium at the construction site at the lusium at the construction site at the lusium at the KRW 73,49,860 in the construction site at the lusium at the lusium at the lusium at the construction site;

C. On December 15, 2015, with respect to the construction cost at the construction site of the construction site of the construction site of the construction site of the construction site of the Oralstop apartment, the Defendant entered into a soil and sand transport contract with 1,600 won per 1,600 cubic meter per 1 cubic meter from the 12.5 cubic meter from the 25.5 to the 12.5 cubic meters of the dump 25.5 tons of the dump 25.5 tons of the dump 2,20,00 won of the dump 3,611 and the dump 72,220,000 won of the dump dump (=3,611.51,600).

After delivery of the plaintiff's seizure and collection order, in the third debtor's statement submitted by the defendant to the above execution court around January 25, 2016, the defendant recognized that the defendant had the obligation of KRW 49,430,870 except value-added tax with respect to the opposite debtor, the debtor.

[Ground of recognition] Unsatisfy, Gap evidence Nos. 1 to 4, Eul evidence Nos. 3 and 4-1 to 3.