logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 2014.12.23 2014고단1705
업무상과실치사
Text

Defendant

A. One year of imprisonment without prison labor, Defendant B, and Defendant G, and Defendant C and Defendant E.

Reasons

Criminal facts

Defendant

E Co., Ltd. is a corporation established for the purpose of building construction business, etc. at H in the Jeonbuk-si, the Jeonbuk-gun, and the defendant limited liability company C entered into a subcontract for the above construction work from the above E as a corporation established for the purpose of soil construction business, etc., and the defendant limited liability company entered into a subcontract for the above construction work, and the defendant Eul is the head of the site of the above C in charge of safety and health management who takes charge of the direction of the construction site and the prevention of harm and danger to workers in the workplace, and the defendant D is the chief of safety and health management officer who takes charge of safety and health management who takes charge of the work for the prevention of industrial accidents to be employed by the workers belonging to the head of the site of the E Co., Ltd. and the workers employed by the contractor

1. Where a business owner engages in the work of using vehicles' construction machinery, he/she shall conduct a prior investigation into the relevant work, the topography, ground level, floor level, etc. in the relevant place of work, and record and keep the results thereof, in order to prevent any danger to workers, and prepare a work plan which includes operating routes and working methods, etc. in consideration of the results of the investigation, and, where he/she conducts the work of handling heavy objects, he/she shall prepare a work plan which includes safety measures to prevent the danger of fall, fall, electric shock, narrowness, and collapse, and require

On June 10, 2014, the Defendant had workers A, etc. of the above C perform the installation of steel plates using the excavated machine to complete the work of laying excellent pipes at the construction site for the improvement project of the I Sewage culvert located in K located in the Jeonbuk-gun, Jeonbuk-gun, North Korea on June 10, 2014.

On the other hand, the above excavated machine is a vehicle system construction machine, and the above strong board, which is a heavy object, is 306 cmx 200 cm, and 864 cm, and the defendant is the above.

arrow