Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. The rehabilitation company A (hereinafter referred to as “A”) is a company that engages in the manufacture and wholesale retail business of LED lighting and ELIS Corube (hereinafter referred to as “LA”) and the Defendant is a company that conducts research, development, manufacture, and sale of DNA and related products using LAD technology, and the non-party C Co., Ltd (hereinafter referred to as “C”) is the Defendant’s cooperation company that creates a BLU (Bak right Unit) with LAs Tube and supplies it to the Defendant.
[Ordinary process in the event that the products are produced in quantity, A shall deliver A’s L CD Glass Tube to C, C shall deliver C shall deliver BLU (Bak Right) with the L CD Glass Tube to the Defendant, and the Defendant shall create the LCM with the LCM with the Glas Pranel attached by the GLU, and supply it to Non-Party ELE with the LCM with the Glas Pranel attached by the Glas Panel (Glas Pranel), and ELE produces L CD TV, etc. completed with the cover of the frame of the LCM.]
Around October 2008, the Defendant: (a) established a plan for the mass production of the “V63M” (hereinafter “V63M project”) from 2011, which is the existing mass production model of the L CD monitor used in TV or L CDAs (hereinafter “LCM”); (b) however, the Defendant planned to receive from C the BLU containing V6 LLs Tube for 56 use by entering V6 LCM.
C. A around the end of 2008, upon receiving a proposal from C to participate in the development of the instant case for the 56-use LROMs Tube, which is necessary for the Defendant’s V6 LCM project (hereinafter “instant development”), several meetings were held with C or the Defendant from February 2009 to November 2009 as indicated below.
On February 10, 209, C: B (Representative), D, E: F, G, H - E Tub Glas sampling provision - Noral Teub Gas sampling provision (3/25), Noral Teub Gas sampling provision (7/20 limited) - On March 16, 2009, a meeting room A: B (representative), I, J: F, G LG: K, L, M, N,O-O - high efficiency lass.