logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 해남지원 2019.05.30 2019고단57
업무상과실치사등
Text

A defendant shall be punished by imprisonment for six months.

However, the execution of the above punishment shall be suspended for one year from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

The Defendant is an individual entrepreneur who runs a dried, dried, dried, and dried-type building and house repair business in Jindo-gun B, and is indicated as “F” in the written indictment, but according to the prosecutor’s interrogation protocol, etc. against the Defendant, the orderer for warehouse repair work is recognized as “C,” and such correction is made as above.

From now to now, the person in charge of safety management at the site of repair works is the person in charge of safety management at the site of repair works in Jindo-gun D.

The Defendant, as the business owner and safety control manager at the above repair work site, performed work at a place with a high height of at least 2 meters and at a risk of falling, has a duty of care to prevent any danger to workers by paying a safety belt and wearing a safety belt if he/she wears a safety belt, and by taking necessary measures to prevent any danger to workers, such as falling on the roof covering with weak robbery, such as slate and lifts, if there is a risk that workers might suffer danger, such as falling in the course of performing the work on the roof covering with weak materials, such as dust, etc., such duty of care.

Nevertheless, on February 25, 2018, the Defendant: (a) around 10:30 on February 25, 2018, the victim G (the age of 61) who is an employee of the Defendant (the age of 61) engaged in the fixed work on the roof of the roof, did not install a safety belt, did not pay the safety belt to the victim; and (b) did not install the fall protection net; and (c) did not cut down the victim, who took the sunlight installed in the line, fell down on the floor below 6.7 meters.

Ultimately, at around 10:50 on February 25, 2018, the Defendant’s negligence in the above occupational negligence led to the death of the victim due to the diversified damage at the GI Hospital located in Jindo-gun, Jindo-gun, and at the same time preventing workers from falling down.

arrow