(영문) 서울고등법원 2016.01.15 2015나2039607
손해배상(기)
Text

1. All appeals by the Defendants are dismissed.

2. The costs of appeal are assessed against the Defendants.

Purport of claim and appeal

1.

Reasons

1. The reasoning of the court’s explanation concerning this case is as follows, and this case is cited in accordance with the main sentence of Article 420 of the Civil Procedure Act, since the reasoning of the judgment of the court of first instance is the same as that of the judgment, except for dismissal or addition as follows.

Each "Housing Guarantee for Defendant" in the part of the reasoning of the judgment of the first instance court shall be dismissed as "Defendant Housing and Urban Guarantee Corporation", and the "General Assembly for General Accounting" in attached Table 7 shall be dismissed as "Liquidation General Assembly", and the part 34 in attached Table 32-35 in attached Table 32-35 (the part overlaps with the part 33) shall be dismissed as in attached Table of this judgment.

Part 4: “A determination” column for “construction of T2F floor of underground parking lot B2F RENCH stoppy” is added to the “judgments” column for “it is difficult to see that the 5,739,301 won calculated by the appraiser is excessive.”

No. 15 No. 8 of the table 8 "the defendant's assertion" in the "construction for piling up the bricks for the equipment room for the test of running water on the 30th additional 30th additional public occasions" added "the remuneration for this item shall be excluded from the total cost of repairing defects or from the total amount of the cost of repairing defects or from the average cost of 8-1-3 "the cost of piling up and reducing snow" to "the cost of "the appraiser shall be applied to the daily price of "the cost of piling up and reducing snow" in the same sequence 8-1-3 "the cost of filling up and reducing snow" shall be the one that is irrelevant to this item and cannot be applied in consideration of the fact that the location is narrow and the difficulty of the work is difficult to view that the opinion of the appraiser is unreasonable."

The term "items 10" in the table 15 No. 10 means "construction with the floor space, remote area, ceiling site, rupture, fung and fungum of each household" as "construction with the height of balconys of the household", and the term "judgments" in the same sequence means "highly re-establishing", and the above "judgments" column.