logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울행정법원 2018.07.20 2018구합51041
중소기업자간 경쟁입찰 참여자격 취소 및 참여자격 취득제한처분 취소청구의 소
Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. The Plaintiff is a small and medium enterprise that implements a marine environmental monitoring design and construction project.

B.1) On July 20, 201, the Seoul Regional Procurement Service was entrusted by the Korea Meteorological Industry Promotion Agency, and is a navigational aid or a fixed building indicating a place where rocks or water depths are located on the sea surface, etc. The Plaintiff submitted a public announcement of tender for a replacement project by submitting a proposal for technology evaluation to replace climate equipment, such as a 201-year mal meteorological observation equipment table, or observation tower, to a maritime structure, such as a 201 observation device or observation tower, and transmit observation data using satellites. A replacement project announcement was made on July 31, 2012.

C. 1) On June 7, 2012, the Seoul Regional Procurement Service entrusted by the Korea Meteorological Industry Promotion Agency, and sent the equipment by observing and transmitting the wave cycle, water temperature, etc., after leaving the sea as a table. The Seoul Regional Procurement Service publicly announced the “tender for the project to be introduced by the Pakistan in 2012” which produces and installs 9 parts, and announced the “tender for the project to be introduced by the Pakistan in 2013” which produces and installs 8 parts of the Pakistan in April 12, 2013. (2) The Plaintiff, at the request of the Korea National Meteorological Agency (hereinafter “the Korea National Meteorological Agency”), submitted a proposal to prepare a substitute evaluation part of the Austria’s sexual assessment part, and reflected it at a price higher than the bid price of the Austria’s site, and decided as a successful bidder.

1. On July 19, 2016, the Fair Trade Commission set forth the Plaintiff and the Plaintiff B.

order of correction in relation to the act of this subsection.

arrow