(영문) 서울중앙지방법원 2017.08.24 2016가단5184172
구상금
Text

1. The Defendant’s KRW 358,189,706 for the Plaintiff and KRW 5% per annum from May 20, 2016 to August 24, 2017.

Reasons

1. Facts of recognition;

A. On February 3, 2014, with respect to the buildings, machinery, and movables located in Nonparty B and C (hereinafter “Cri”) and three parcels, the Plaintiff, on April 1, 2015, as to the buildings, machinery, office fixtures, and facilities located in Nonparty E and F, on December 9, 2015, as to the buildings, machinery, equipment, and facilities located in Nonparty G Co., Ltd (hereinafter “G”) and F, respectively, and as to the buildings, and machinery located in F, “each of the instant insurance contracts”.

B. The Defendant is the insurer that entered into the contract. B. The Defendant was the owner of the land and the building on its ground in the name of “J” and made the floor materials, etc. from this place to the name of “J”, and the Defendant was the owner of the building above the building owned by the Defendant, which is the J low-herified storage lower than the J-he

contained in this chapter.

C. On January 20, 2016, at around 01:20, explosiond fire occurred in the J warehouse, and “the instant fire” refers to “the instant fire.”

), 같은 날 01:27경 K소방대가 도착하였으나 도착 당시 J 창고의 화재는 최성기인 상태로 인접 건물로 불이 번졌고, 같은 날 03:28경 화재가 완전 진화되었으나 원고와 이 사건 각 보험계약을 체결한 E, B, G의 건물, 기계, 집기류 등이 전소, 소실 또는 훼손되었다(J 창고 및 위 피해자들의 건물은 모두 철골조 샌드위치 판넬즙이고, 기계, 집기류는 위 건물 내에 있었다

(D) The Plaintiff paid the following insurance proceeds in accordance with each of the instant insurance contracts. The amount paid as of the payment date of the insured (the amount paid as B B B 2016-04-08 150,000,000 2016-05-20 178,484,484,328,484,411 Japan 328,484,484,411 E 201-05-03 88,605,705,783 G 2016-04-29,289,219 combined 716,379,413

E. On January 22, 2016, the part related to the cause of a fire in the report (Evidence A 3) prepared by a strike fire brigade to investigate and prepare the instant fire on January 22, 2016 is as follows:

Fire causes which need to be fire investigation: US - fire factors (unexplos) are being built in the J warehouse to make polyethylene ethyl for three days after the process of manufacturing the factory.