logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2017.02.08 2016나308560
부당이득금
Text

1. All appeals filed by the plaintiffs are dismissed.

2. The costs of appeal are assessed against the Plaintiffs.

The purport of the claim and appeal is the purport of the appeal.

Reasons

Basic Facts

Before the Daegu Suwon-gu, 531 F was divided into 24 G on November 25, 1924, 119 former H, and 388 former H on November 25, 1924. At the same time, the land category was changed to a road.

(hereinafter “H land before subdivision.” On December 28, 1990, the registration of ownership preservation by Australia inheritance was completed under the name of December 28, 199 with respect to the land before subdivision, and thereafter, it was divided into each land listed in the separate sheet (hereinafter “each land of this case”).

On July 25, 1911, the land before subdivision was designated as the first-class road between Gyeongsung and Seosan as the land scheduled for the first-class road between Gyeongsung and Seosan on July 25, 191. On November 25, 1924, the land category was changed to a road, and it was assigned as part of the Daegu-Gyeongsan-do road, which was occupied and managed as the road, and provided for the passage of the general public and vehicles.

In addition, on December 1, 1938, the land before subdivision was designated as K by the Joseon Road Order as the "Gyeongsung 1" route. On December 27, 1966, the land before subdivision was designated as the "Gyeongsung 1" route by the Presidential Decree No. 2845 (Designation of Routes for Class 1 National Highway and Class 2 National Highway). On September 29, 1969, the land was designated as the Mu line among the Musan Urban Planning Facilities among the Musan Urban Planning Facilities.

On September 19, 1969, the Gyeongsan-si continued to perform the road expansion work on the 235 parcel of land to be additionally incorporated into the 25th National Road Daegu-Gyeongsan-do road section, and provided it to the general public for the traffic of the general public by completing the said expansion work. In addition, according to the plan for the expansion and packing of national highways from the end of the end of the 1977 to February 1978, the compensation procedure for the 214 parcel of land to be additionally incorporated into the 25th National Road Daegu-Gyeongsan-do road section, while the road expansion and packing work was completed by May 1978, and provided it to the general public for the traffic.

On July 1, 1981, the land before subdivision was occupied and managed by the defendant due to the administrative district change, and each of the instant land was divided into each of the instant land and then divided into each of the instant land.

arrow