(영문) 서울남부지방법원 2016.03.30 2014가단243603
구상금
Text

1. The Defendant’s KRW 25,345,597 as well as the Plaintiff’s KRW 5% per annum from November 29, 2014 to March 30, 2016.

Reasons

1. Facts of recognition;

A. On October 2014, the Plaintiff leased a commercial building rebuilding (hereinafter “instant building”) on the two-story stores located outside Yangcheon-gu Seoul and two parcels, Yangcheon-gu, Seoul, and operated the hospital, and requested the Defendant, the removal business entity, to restore the instant store to its original state, which is the object of lease, to deliver the said store thereafter (hereinafter “the removal work of this case”).

B. From October 4, 2014, the Defendant continued to perform the removal work of this case with his employees. From October 5, 2014, around 11:20 on October 5, 2014, the Defendant discovered that the removal work of this case was discontinued at the time of diving and that the remainder of the tent, which had not been removed on the wall side and continued to increase the right to the wall side with the man and the body.

Accordingly, in the course of the removal of the above ceiling by taking advantage of the strip, the electric wires installed in the vicinity of the ceiling was destroyed by the stringr caused the stringr to fall off together with the above ceiling, and the stringr was destroyed by the stringr, and the stringr caused the enormous volume of the damaged stringr to fall down.

C. In the singingler, the water soed out from the second to the first underground floor of the instant building did not stop the fire valves, and only one of the two parts and the instant building security guards stopped the water pipe up to the mechanical room.

The defendant and the body of the people left the place of removal work of this case by making meals without completing repair of the sprinker which has sprinked and damaged water stop, and among them, water re-sprinked from the sprinkr by cancelling the lock locking system of the mechanical room.

The defendant and the body of persons leave the above site and they are engaged in the management of the building of this case or occupants, etc.