Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Details of the disposition;
A. On October 15, 2010, according to Article 7 of the Industrial Sites and Development Act, the outline of the project was changed to “F and D” due to the commencement of the project as of July 1, 2014 at the Cheongbuk-gun, Chungcheongnam-gu, Cheongbuk-si, Cheongbuk-gu, Cheongbuk-do as of July 1, 2014.
The original land was designated as E and publicly announced as E, and the main contents thereof are as follows:
1) Project name: E development project (hereinafter “instant project”);
(2) Location: 3,31,701 square meters in size: The president of the Chungcheong Development Corporation from 2007 to 5, 2015; the project operator of the project area of 3,331,701 square meters in size:
B. The Defendant’s implementation plan for the establishment of relocation measures and the selection plan of a person subject to relocation measures around July 2014: In principle, a person subject to relocation measures shall be supplied at a cost of 70% of the development cost on the basis of one parcel (165 square meters or 265 square meters) per household only for a person subject to relocation measures (excess: appraisal amount) based on the date of public announcement of designation of a district (15 October 15, 2010) (the date of public announcement of designation as a person subject to relocation measures) through the date of conclusion of a contract or the date of adjudication of expropriation of a building who has continued to reside in a residential building on the basis of the eligibility classification of an unauthorized building owner and a building for which illegal use has been changed on or before January 24, 1989 as an unauthorized building without permission on or before May 9, 206 to the date of conclusion of a contract, and the eligibility classification of an unauthorized building owner and a building for non-qualified use (other than 5.6.
C. 1) The Plaintiff: (a) 154 square meters in store of the general steel structure 15 square meters on the ground of 745 square meters in the Cheongju-si G warehouse site of Cheongju-si; and (b) 174.5 square meters in store of the 2-dong light steel structure agricultural warehouse of the 2-dong light steel structure (hereinafter “instant building”).
2) The instant building is an unregistered building.