(영문) 의정부지방법원 2013.11.28 2011가합10300
손해배상(기)
Text

1. The defendant Yangju-si shall pay to the Plaintiff KRW 3,151,561,728 as well as its annual interest from July 29, 201 to November 28, 2013.

Reasons

1. Facts of recognition;

A. The Plaintiff is running a wholesale business, such as a wholesale business for paintings, etc. with the trade name “C” in Yangju-si.

B. In the Plaintiff’s workplace, the State-funded local highways of 56, “Yeong-gam-gam-gam-gamham-gamham-gamham-gamham-gamham-gamham-gamhamham-gamham-gamhamham-gamhamham-ham

The Plaintiff’s workplace is located at a lower area than the above mountain and local highway, and the Plaintiff’s workplace passes through a sewerage system of 2 meters in width and 2 meters in depth from the above mountain to the new stream of the Plaintiff’s workplace (hereinafter “instant sewerage system”). The instant sewerage system, which passes through the said Do highway, is installed as a ground drainage channel for the remainder of the area.

C. There were only one re-facilities construction due to the flood damage that had been ten years prior to the completion of the re-facilities construction, which remains without removal of the brine that should have been removed after the completion of the re-facilities construction. The luminous cable line, which could not be installed in the instant sewerage facilities, was installed along with a luminous cable, and was able to turn forward to one another within the instant sewerage facilities.

On July 27, 2011, 201, the aggregate daily rainfall 466.5m m. At the same time, the Plaintiff’s place of business, left the sewerage facilities of this case, which were able to be able to be impreed by earth and sand and Gemangsium in the Yansan located adjacent to the Plaintiff’s place of business.

As a result, rainwater that should have flown into a new river through the instant sewerage facilities has not been drained and has flown over to a local highway through Mandoman. On July 29, 201, rainwater that has flown over the road was flown to the Plaintiff’s workplace, and the Plaintiff’s workplace corresponding to 1,100 square meters is the Plaintiff’s workplace.