logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 여주지원 2018.12.06 2017가단55980
소유권이전등기
Text

1. The Defendant, in sequence, shall each point of 10, 12, 5, 11, and 10 of the annexed drawings among the land size of 247 square meters in Echeon-si, Leecheon-si.

Reasons

1. Facts of recognition;

A. D completed each registration of transfer of ownership on September 14, 1987 with respect to the land No. 1 in this case and the land No. 1,010 square meters E in Ischeon-si (hereinafter “the land No. 2 in this case”) on September 15, 1987.

B. On November 1, 1987, the land category of No. 2 was changed to a gas station site. D newly constructed a reinforced concrete structure sloping roof 203.64 square meters on the ground of the above No. 2 land. Fire-proof walls (hereinafter “instant fire-proof walls”) was installed in the vicinity of the boundary with the land No. 1 adjacent thereto. On the ground of the above No. 2 land, 5 oil storage tanks were laid underground near the boundary with the above land, and around August 29, 2003, on the ground of the above No. 2 land, the land No. 2 was extended to 29.7 square meters on the ground of the above land.

(hereinafter referred to as the “instant gas station building and facilities”

D On the ground of the instant land, 101.5 square meters of a reinforced concrete slive roof slive roof, a simple resting room for 101.5 square meters (hereinafter “instant resting building”) was newly constructed, and on April 21, 198, the registration of ownership was completed with respect to the instant resting building.

The ownership of the instant land and the instant gas station building and facilities was transferred in sequence to F on March 15, 1989, to G on April 10, 1995, to H on April 30, 1996, to H on September 28, 1998, to J and K on August 29, 2003, to the Plaintiff on June 21, 2005.

E. On March 2, 2005, the Defendant completed each registration of ownership transfer on the land No. 1 and the building of the rest room of this case based on the sale on the same day.

F. According to the court’s entrustment of measurement and appraisal, the fire wall of this case is installed on the line connecting each point of the items indicated in the annexed drawing Nos. 10, 11 among the land No. 1, and based on this, the part to be able to perform maritime affairs connected with each point of the above No. 1 among the above land No. 1, the same drawing No. 10, 12, 5, 11, and 10 (hereinafter “the part to be registered among the land No. 1”), shall be gas station the area of which is 18 square meters.

arrow