Text
1. Defendant D Co., Ltd shall pay to the Plaintiffs each amount of KRW 133,120,300 and each of the above amounts from September 25, 2019.
Reasons
1. Basic facts
A. On July 8, 2016, the Plaintiffs are the instant forest land E in Gwangju-si (hereinafter “instant forest”) with the size of 659 square meters.
The co-owners of the instant forest land, each of which completed the registration of ownership transfer with respect to 1/2 shares, are co-owners of the instant forest land. 2) Defendant C is a company operating a furniture factory in Gwangju City FF factory site and 2,016 square meters and its ground, Dong-dong building (hereinafter “instant factory site and factory”) adjacent to the instant forest land, and Defendant D is a company being supplied with extension works of the instant factory and retaining walls (hereinafter “instant extension works”).
B. 1) On September 23, 2015, H, the representative director G of Defendant C, acquired ownership of the instant factory site and factory on September 23, 2015. 2) Defendant C concluded a contract to extend the instant factory to operate the following household factory: (a) on November 13, 2015, G extended the two floors of the instant factory to Defendant D; (b) removed the three-story factory; (c) newly constructed the instant two-story factory; and (d) removed the existing retaining wall installed in the instant factory site; and (e) executed the construction project to install the instant retaining wall at KRW 3.52 million for the construction cost (hereinafter “instant contract”).
3) Around November 13, 2015, Defendant D commenced the instant extension work and completed the construction work on or around February 2017. C. In the process of the instant extension work, approximately KRW 415.16 square meters of the instant forest land (hereinafter “instant damaged part”), among the instant forest land, was destroyed by a structure of materials of ar tar (hereinafter “instant structure”) installed to protect sloping areas, and some earth and sand were destroyed.
2 The Plaintiffs are “G” and H.