1. On January 16, 2013, the above court with respect to the Daejeon District Court's 2008 Seosan District Court's 2008 Book1 shipowner, etc.

Reasons

Ⅰ. Basic facts

1. The occurrence of the instant accident

A. On December 7, 2007, the main tugboat "T (T)-5" and the auxiliary tugboat "T (T) T-3" were scheduled to 1,828 tons of Samsung Heavy Industries Co., Ltd., Ltd., and were sailing to the "Tsung Heavy Industries Shipbuilding" at the port of Incheon, while the towing line of "Tsung 1" was cut down, around 07:06, at the 6th coast of Taenam-gun, Taenamnam-gun, Taenam-gun, Taenam-do, the 146,848 tons of Hong Kong Ship's 146,848 tons and the auxiliary tugboat "T-3", the oil tanker "T (T-5, the oil tanker "the oil tanker of this case"), and the oil tanker of this case was leaked to 30,500 tons of the cargo of this case (the oil tanker of this case) and the oil tanker of this case (the oil tanker No. 140,500 tons of the oil tanker of this case).

(hereinafter “instant accident”). (b)

The oil leaked out of the instant accident had a strong impact on the wind of Northwest, and last 15 hours was pushed down on the coast of Chungcheongnam-gun, Chungcheongnam-gun, the coast south-west, the south-west coast of the accident point. On December 10, 2007, the fourth day of the accident occurred, the 70km length of 70km away from the west-gun, Chungcheongnam-gun, the west-gun, the west-gun, the coast of the accident point, to the coast of the west-gun, the west-gun, the west-gun, the coast of the accident point, and the 4th day of the accident.

C. Even after December 10, 2007, oil leaked, due to the influence of tidal currents, has been moved to and spread to the coast in the direction of the wind of the Northwest-gun on December 15, 2007, the nineth day after the accident occurred, to the sea in front of the west-gun, Chungcheongnam-do, and to the sea in front of the end of the 11th day on December 17, 2007, and to the 31th day on January 6, 2008, the 31st day after Jeju-do, Jeju-do, Jeju-do, Jeju-do, respectively.

2. Commencement of procedures for limiting liability and reporting of limited claims;