Defendant
A Imprisonment for one year, and Defendant B for ten months without prison labor, Defendant C and D for six months, and Defendant E for a fine.
Reasons
Punishment of the crime
[Status of Defendant A] On October 13, 2014, Defendant A was appointed as a joint supplier and a field agent and a safety and health management manager of G Co., Ltd and H Co., Ltd. and H Co., Ltd., a joint supplier of the new Tsports center (hereinafter “instant sports center”) in Dongjak-gu Seoul Metropolitan Government, as a joint supplier of the new sports center, and was responsible for the overall construction and safety management of the instant sports center.
Defendant
C As the actual site agent of the I stock company that entered into a subcontract for reinforced concrete construction among the construction works of the said G and the instant sports hall, the person who was responsible for construction works in the area of molds, steel bars, and concrete.
Defendant
B As a construction engineer of U, a responsible supervision service company, U.S., he/she was selected and stationed at the site as a responsible supervisor of the new sports center of this case on February 3, 2013, and confirmed whether a building, building equipment, or structure is constructed in accordance with design documents, and was in charge of guidance and supervision on quality control, safety control, etc.
Defendant
D As a building engineer working as a so-called franchise, it is a system distribution (=system operation) that supports fry, etc. in connection with concrete string construction works on the roof of the instant sports center, and is a person who has been in charge of examining the safety of structural design of the system distribution (mix) (i.e., no temporary installation installed to support the fixed load and the load of construction until a certain strength is obtained; hereinafter the same shall apply).
Defendant
E is the representative of the V Co., Ltd. and a construction engineer with a professional architectural structural engineer's license.
Defendant
G 주식회사(이하 ‘G’이라 한다)는 토목건축공사업 등을 목적으로 설립된 법인이다.
Defendant
H Co., Ltd. (hereinafter referred to as “H”) is a corporation established for building and engineering work, etc.
Defendant
I Stock Company (hereinafter referred to as "I") is established for the purpose of reinforced concrete construction business.