Defendant
B and D Each fine of KRW 5,00,000, and KRW 3,000,000 each fine of KRW 3,00,000.
Reasons
Punishment of the crime
Defendant
A Co., Ltd. is a corporation established for the purpose of the construction of reinforced concrete works, etc., and is the owner of G new construction works performed at the F at Seosan-si. Defendant D is the representative director of the above corporation, who is the general manager for safety and health. Defendant A is a corporation established for the purpose of civil engineering works, etc., and is the business owner who subcontracted metal works from the above corporation C during the above new construction works. Defendant B is the representative director of the above corporation, and Defendant B is the general manager for safety and health, and Defendant E is the head of the above metal work site and is obligated to take measures to prevent the risk of workers working at the above construction
1. Defendants B and A
A. On June 29, 2015, around 10:30 on June 29, 2015, Defendant B had workers, such as metal construction sites, victim H (65 years old) employed by the Defendant, etc. during the process of melting the top of the line for storing goods.
A business owner shall take safety measures, such as attaching goods, materials, absence, etc. to prevent them from falling, and where it is apprehended that workers may fall or fall, or work on machinery, facilities, ship blocks, etc., and where it is apprehended that workers might pose a danger, he/she shall install a work sign by assembling a gauge, etc.
Nevertheless, the defendant did not take the above measures at the construction site and caused the victim who did the above work to fall on the floor below approximately 2.4 meters, along with the top.
As a result, the defendant caused the death of the victim from multiple long-term damage in his/her job.
B. Defendant A, a representative of the Defendant, committed an act identical to that described in the preceding paragraph in relation to the Defendant’s business.
2. Defendant E on June 29, 2015, at the site of metal construction among the foregoing new G construction works around 10:30.