(영문) 서울고등법원 2016.06.30 2015누35040
시정명령취소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. Modern Construction Co., Ltd. (hereinafter referred to as “Modern Construction Co., Ltd.” in the name of all the companies; hereinafter referred to as “Co., Ltd.”) status of the Plaintiff, etc. (hereinafter referred to as “14 construction companies,” including the above 7 large construction companies), treatment construction, Samsung C&T construction, scen construction, clin construction, eco-cinization globalization, Hanjin Heavy Industries, Samjin Heavy Industries, C&T (hereinafter collectively referred to as “7 large construction companies”), scin construction, scin construction, joint-use construction, building, metal construction, scin construction, Gyeongnam-gu, Nam-gu, T&T, T&T, Samsung Heavy, Samsung Heavy Industries, and Han (hereinafter referred to as “14 construction companies, including the above 7 large-scale construction companies”), and the construction companies (hereinafter referred to as “Plaintiffs, etc., 21 construction companies and Korea Fair Trade Commission Act, including the Plaintiff’s construction companies and Korea Fair Trade Commission Act.

B. Construction works for the construction works for the high-speed high-speed railroads and their bidding outlines are construction works for the high-speed high-speed railroads with the total length of 184.534 km between the high-speed railroads and the high-speed railroads. This is, along with the high-speed railroads, construction works for the high-speed railroads with the large-scale border project promoted to form a axis for traffic and life as a major network of Korea, approximately KRW 8.352.9 billion has been invested. The above construction works were classified into 19 sections, and among them, the construction works for the 1-1 sections and 3-2 sections were conducted by design and package deal projects, and the construction works for the 1-2 sections, 1-4 sections, 2-3 sections and 4-2 sections were conducted by alternative bidding, and the rest of the construction works for the 2-13 sections, including the construction works (hereinafter referred to as the “instant construction works”).

section 2.2.