logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2014.05.13 2013가단8796
토지인도 등
Text

1. The defendant

A. Of the land size of 209 square meters in Kimhae-si, each point of the attached Form No. 2, 3, 21, 20, 20 and 2 shall be in sequence.

Reasons

1. Basic facts

A. (1) The Plaintiff’s acquisition of shares (1) 209 square meters and D 209 square meters (hereinafter “instant land”) were: (2) ownership transfer registration was completed on December 28, 1968 with respect to the subsequent land (hereinafter “each of the instant land”); (2) ownership transfer registration was completed on the instant land under the name of the Plaintiff’s 20/9 square meters and D 96 square meters; (3) ownership transfer registration was completed on August 5, 198 with respect to each of the instant land under the name of the Plaintiff’s 20/92 square meters; (3) ownership transfer registration was made on each of the instant land under the name of the Plaintiff’s 20/96 square meters; and (4) ownership transfer registration was completed on each of the instant land under the name of the Plaintiff’s 20/96 square meters; and (3) ownership transfer registration was made on each of the instant land under the name of the Plaintiff’s 20/96 square meters; and (4) ownership transfer registration was made on each of the instant land under the name of the Plaintiff’s.

The building of three floors or less without permission is called "the building of three floors or less" on both sides.

(3) has occupied and used the building of this case.

arrow