(영문) 특허법원 2017.11.24 2017나1346
손해배상(지)
Text

1. The judgment of the court of first instance is modified as follows.

Plaintiff (Counterclaim Defendant) B and Plaintiff C, the Defendant (Counterclaim Plaintiff).

Reasons

The principal lawsuit and counterclaim shall be judged together.

1. Basic facts

A. The status of the parties 1) Plaintiff A is a company established for the purpose of manufacturing and selling boilers, etc. on January 23, 2013, and producing wood pellets, etc., Plaintiff B is the representative director of Plaintiff A, Plaintiff C is the vice president of Plaintiff A. 2) Defendant D is a company established for the purpose of industrial boiler (romoer), manufacturing and selling boilers, etc. from March 28, 2014 to March 12, 2014. Defendant E is a company established for the purpose of manufacturing and selling plastic products from January 14, 2013 to March 12, 2014, and was working for Plaintiff A, and established for Defendant D’s representative director from March 28, 2014 to July 14, 2015. Defendant F is a company established for the purpose of manufacturing and selling plastic products from the building type to the manufacturing and selling business of the building, etc.

B. The title of the patented invention (A) invention of this case: G2) filing date/registration date/R3: the patentee: the first outer framework (1) of metal materials connected to the outside side of the plaintiff B, C. 1 of the claim 1 and the first short body (12) of fireproof material formed in the inside side of the first outer framework (11) and the first short body (11) of fireproof material formed in the upper part of the said 1 outer frame (1) and the second short body (12) above, which form a two-dimensional upper part of the said 2nd body (2nd body) body (12nd body) composed of two-dimensional upper parts of the above 13rd body (13), the first outer framework (11) and 12nd body (12nd body) composed of two-dimensional upper parts of the above 12nd body (2nd body) body and the second upper part of the 12nd body body (14th body frame) composed of two-dimensional upper parts of the above 2nd body (22nd body) body).