(영문) 인천지방법원부천지원 2016.11.09 2016가단103813
손해배상(기)
Text

1. The Defendant (Counterclaim Plaintiff) paid KRW 7,308,40,00 to the Plaintiff (Counterclaim Defendant) and its related amount from April 5, 2016 to November 9, 2016.

Reasons

1. The principal lawsuit and counterclaim shall also be deemed to exist;

A. On November 13, 2013, the Plaintiff and the Defendant: (a) on November 13, 2013, the 3 and 4 floors (hereinafter referred to as “instant building”) from among the buildings located in Seocheon-gu, Seocheon-gu, Seocheon-gu, the Plaintiff owned by the Defendant are collectively referred to as “the 3rd floor of the instant building; and (b) when specifying each floor, the 3rd floor of the instant building; and (c) “the

2) The Defendant’s lease agreement is based on the following terms and conditions:

A) A contract was concluded. The lease object: 3,00,00 won: 23,00,000 won per month: 2,300,000 won per month: - From January 1, 2014 to December 31, 2015 - the lessee shall restore the leased object to its original state and deliver the lease deposit to the lessor. The lessor shall return the leased object to the lessee. The lessor shall complete the lease deposit - the floor was installed with the main text installed within the office partitions, the total deposit amount of B4,00,00 won - the number of rent 2,30,000 won - the number of rent 2,30,000 won - the number of rent 2,30,000 won - the number of rent - the building from January 1, 2014 to December 31, 2014 to December 30, 2014.

B. On January 2, 2015, the Plaintiff entered into a fire insurance contract with the Intervenor joining the Defendant with the content that the entire building, including the Defendant’s Intervenor and the instant building, shall be subject to insurance, and the period of insurance shall be from January 2, 2015 to January 2, 2016, ensuring liability for fire and fire-fighting. 2) The Defendant and the Defendant’s Defendant’s insurance period from August 31, 201 to August 31, 2016.