Text
1. As to the accident described in the attached list 1, the plaintiff (Counterclaim defendant) based on the insurance contract listed in the attached Table 2.
Reasons
1. Around 13:00 on July 1, 2013, B entered into the instant insurance contract with the purport that the Plaintiff and the daily life of which are liable for statutory liability for property damage caused by an accident, thereby damaging the front, rear, front, rear, rear, side, roof, etc. of the motor vehicle listed in the separate sheet No. 1 (hereinafter “instant motor vehicle”) owned by the Defendant due to the instant accident.
[Ground of recognition] Unsatisfy, entry or video of Gap evidence 1, 2, 4, and 5 (including various numbers), the appraisal result of appraiser C, the purport of the whole pleadings
2. Occurrence of and limitation on liability;
A. According to the facts acknowledged in the above 1. Paragraph (1) above, the Plaintiff is obligated to pay the Defendant insurance money based on the insurance contract of this case in relation to the instant accident.
B. While limiting liability, the Defendant has a duty of care to safely park a vehicle in a place where there is no risk of the accident when parking the vehicle. In particular, since the construction of the vehicle in the adjacent building where the instant vehicle was parked at the time of the instant accident is likely to cause an accident due to the falling accident, despite the fact that there was a duty of care to park the vehicle at the place where the accident would not occur even if the falling accident occurred, it is negligent in neglecting this duty, and the Defendant’s negligence contributed to the occurrence and expansion of the instant accident, and it is reasonable to view the Defendant’s negligence as 20% in light of the above circumstances, the Plaintiff’s responsibility is limited to 80%.
3. Scope of damages.
(a) Repair costs (1) incurred in repairing damage caused by the instant accident, 23,696,093 (hereinafter the same shall apply) plus value added tax for KRW 21,541,90,00,00 for technical expenses, KRW 11,041,90 for replacement parts, and KRW 21,541,90 for repair parts, and KRW 240,000 for repair parts.
(2) In addition, it is necessary to repair the instant vehicle.