Text
1. The part against the plaintiff corresponding to the money ordered to be paid under the judgment of the court of first instance shall be revoked.
2...
Reasons
1. Facts of recognition;
A. (1) On October 20, 2009, the Plaintiff entered into a contract on the insurance of domestic workers’ disaster compensation insurance (hereinafter “insurance contract”) with the content that the insured worker bears legal liability for damages exceeding the amount of accident compensation paid under the Industrial Accident Compensation Insurance Act due to occupational accidents caused by the insured worker’s work-related accidents. “Contractor and the insured” from October 20, 2009 to October 20, 2010: 50 million won per capita, 500,000,000,000 won per capita, 50,000,000,000 won per capita, and special circumstances: “I compensate only for the workers belonging to Sungdong-dong: Provided, That the insurance contract for the insurance of domestic workers’ accident compensation insurance (hereinafter “insurance contract”).
(2) On October 24, 2009, the Defendant concluded a comprehensive automobile insurance contract (hereinafter “the insurance contract”) with the content of the automobile’s general insurance contract (hereinafter “the 2 insurance contract”) from October 24, 2009 to October 24, 2010 with respect to the B Kacckick Vehicles A and A (hereinafter “the instant Kacick”): Defendant A, the insurance period: from October 24, 2009 to October 24, 2010; the personal indemnity 1 (100,000,000) and the personal indemnity 2 (less, the insurance period is from October 24, 2009 to March 24, 2010).
B. (1) At around 16:00 on January 8, 2010, C, an employee of the Sungdong area, sent a hand signal with 10 meters of length, which was transported from the floor to the upper part of the instant steel structure, on the top of the left top of the roof of the instant steel structure, which is a height of 6 meters above the ground, at the construction site of the D office building and the steel structure installed in the Jeonnam-gun-gun-gun-gun-gun-gun-gun-gun-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong-dong (hereinafter “instant work”). At around 16:00, C, on the top of the top of the uppermost roof of the instant steel structure, was conducting the work of cutting the above CG-dong-dong-dong-dong-dong-dong (hereinafter “instant work”).
(2) At the time the two persons set the end of both the C-malone of the above C-malones from the floor to their strings.