(영문) 대전지방법원 2020.10.13 2019나108082
손해배상(기)
Text

Of the judgment of the court of first instance, the defendants ordered payment in excess of the amount ordered below.

Reasons

1. Facts of recognition;

A. The Plaintiff is a person who is engaged in the vehicle cream equipment transportation business under the trade name of “D and E,” the Defendant C Co., Ltd. (hereinafter “Defendant Co., Ltd.”) as a business of civil engineering works, construction works, etc., and the Defendant B is a person who is in the position of the head of the Ban at the Defendant Co

B. The Defendant Company received “K Disaster Risk District Maintenance Project” with the content of the river expansion and maintenance work from the Cheongyang-gun, Chungcheongnam-gun, Chungcheongnam-gun, Chungcheongnam-do.

The Defendant Company requested that the Plaintiff pay KRW 500,000 per day to the Plaintiff, and that the Plaintiff transport the steel bars and fumes to each work section using the crums in the above construction site (hereinafter “instant construction site”).

C. On April 28, 2018, at around 08:00, the Plaintiff started with two employees of the Defendant Company assisting the transport of goods after arrival at the construction site of this case and completed the steel transport work before Defendant B arrives at the construction site of this case in order to assist Defendant B with the transport of fume, around 10:00 on the same day.

In the event that the plaintiff moves Defendant B and pumps to a place where they can be fume, and then the window operation loss installed on the left side of the truck loading box is prepared to transport fume, Defendant B would help the plaintiff.

The plaintiff refused the proposal of the defendant B and started work to put up the window near the window installed in front of the truck loading box.

The transportation of fume is carried out in the order that three of the window of truck loading boxes are loaded on the truck with the rate of interest, fixing the cargo by cutting off the window and then moving the freight to the work section to be installed.

E. If the plaintiff is coming down to get off the wind, the wind itself is not the wind, but the wind, which is reached the end of the fruit, and the wind, is cut down.

arrow