(영문) 광주지방법원 2017.08.18 2016가합53840
공사대금
Text

1. As to KRW 430,962,30 and KRW 353,345,380 among the Plaintiff, the Defendant shall pay to the Plaintiff KRW 77,616,920 from March 29, 2016.

Reasons

A. On February 12, 200, the rate of warranty bond for each type of work and the rate of warranty bond for defects of construction 2,480,000,000 for each type of work: 0.2% of the contract amount for delay: the defendant and the plaintiff shall enter into the contract with the contract document attached under the agreement and have to perform their contractual obligations in good faith, and shall prepare two copies of the contract document as evidence of this contract and keep one copy.

Documents to be attached:

1. One copy of the general terms of a contract for private construction works;

2. One copy of the special condition of the construction contract;

3. One copy of the design and calculation sheets* General matters* (Additional Notes).

6.A summary: (c) The scope of the project shall be the whole of the matters specified in the design drawings of the scope of the project. (7) The contents of the design drawings and specifications are different, or, if there is any other error, omission or inconsistency that is not consistent with the relevant project, it shall be determined after the review of the supervision.

23) Other matters not specified shall be dealt with in consultation with the ordering person.* Specialist Port* (Separate Part) construction (hereinafter referred to as a building project) construction (hereinafter referred to as a building project in question, separate floor of trees and interior floors, walls, and ceiling tegrology construction works, and 3) Electric Works, which are not indicated, shall be excluded from estimate. (Construction of Electric Works, etc.) increased or decreased in quantities. (Construction of Electric Works, etc.) Other matters not indicated shall be constructed in accordance with the standard specifications. * This contract shall take precedence over the standard contract, and shall take precedence over those general and special matters, and shall take precedence over those recorded at the time of site site at the time of the attendance of four companies and take precedence over those recorded at the time of site site. (C) The completion of the construction project in question was completed on December 21, 2015 with respect to the extension of the building in this case.

The Plaintiff spent 138,00,000 won beyond the scope of construction stipulated in the instant construction contract. D.

In relation to the instant construction project, the Defendant’s payment details, etc., shall be KRW 500,00,000 for advance payment, KRW 800,000 for the first time payment, and KRW 2,00 for the second time payment.