(영문) 수원지방법원 2015.11.05 2013가합20581
공사대금
Text

1. The plaintiff's conjunctive claim by subrogation against the defendant C and D shall be dismissed respectively.

2. Defendant.

Reasons

(b)be responsible;

(1) The settlement method: (1) The two households, out of the above folds, shall be categorized as the consideration for the construction cost and shall be paid as a substitute deposit

1. One household with the third floor G;

2. One household with the third floor of H. (2) The remainder shall be increased or decreased and paid in cash;

The order owner of the above Corporation B and the beneficiary Plaintiff agreed that the construction will be performed in good faith as provided in each of the above provisions and entered into a contract.

Article 1 (Purpose) Defendant B accepts the terms and conditions of the estimates and specifications submitted by the Plaintiff as part of the contract, and cooperates so that the Plaintiff may complete the construction work within the deadline for completion, and in principle, the Plaintiff shall complete the construction work within the deadline for completion.

The project owner: Defendant B recipient: (a) the 1st estimate of the 2nd estimate of the field name of the 3rd on-site construction site (unit: KRW 49,829,870,879, 389 at the south on-site 2nd on-site, Defendant B’s 3rd on-site construction of the 3rd on-site construction site, and the 1st on-site construction of the 47th on-site 2nd on-site 3rd on-site 2nd on-site 49,267, 464, 408, 108, 360, 360, 406, 106, 47, 106, 104, 104, 360, 367, 406, 406, 304, 105, 104, 104, 106, 367, 630, 467, 30

[Ground of recognition] Facts without dispute, Gap evidence 1 to 5, evidence 1 to 2-1, 2, and 3 respectively.