(영문) 대구지방법원 2014.08.21 2013가합202537
구상금
Text

1. The Defendant’s KRW 187,001,339 for the Plaintiff and 5% per annum from October 11, 2013 to August 21, 2014.

Reasons

1. Basic facts

A. The Plaintiff is a special juristic person established by the Minister of Employment and Labor under the Industrial Accident Compensation Insurance Act to achieve the purpose of compensating employees for any occupational accident promptly and fairly through the implementation of the industrial accident compensation insurance business, and is in the relationship between the insurer and the policyholder in accordance with the Industrial Accident Compensation Insurance Act. 2) A is a driver and the owner of the “B” Crain (hereinafter “the instant Crain”). The Defendant is an insurance company that entered into a construction machinery automobile insurance contract with A with respect to the instant Crain.

3) C (hereinafter referred to as “victim”)

(B) The aforementioned “E” is an employee of F Company who was subcontracted with the steel structure construction among the “E” located in the said Geum River Construction Co., Ltd., and worked at the said new construction site from January 22, 2010. (b) the process of “E” and the process of performing the C-type fixed work, first of all, three sn beam lines are installed in the ground in a vertical line, and the H beam is used as building materials to set steel structures or walls that are unfavorable to the sn beam, such as the snife steel or the snife steel, etc.

B was fixed at intervals of 1.2 to 1.3 meters above the top, and then the wall and roof were attached to it.

2) The shoter’s work to fix the C-type lectures to the H beam beamline with G and H (hereinafter “C-type fixed work”).

and the specific working methods and the location of the victim, etc. are as follows:

"First of all, 3-5 of the C-type 10 meters in length at intervals of approximately 1.2-1.3 meters in length from the ground, which combines wire ropes with each other, and connects them to the c-type river, A, a C-type driver, moves to the H beam beam columns by taking the C-type river.

I, J, on the ground, set the wire ropes combining C-type lectures on the ground so that C-type lectures may not be shakend, and the victims, G, and H are three persons, respectively.

arrow