(영문) 부산지방법원 2019.01.16 2016가합42650
사용료
Text

1. The plaintiff's bankruptcy claim against B against the debtor of bankruptcy shall be confirmed as KRW 238,857,705.

2. The plaintiff.

Reasons

1. Facts of recognition;

A. 1) On April 11, 2007, the Plaintiff entered into a lease contract between the Plaintiff and the Plaintiff Company B (hereinafter “B”).

[Attachment] which the Plaintiff has the right to use;

1. Attached Form among the container inland clearance bases located on each land listed in paragraphs 1 and 2 of the list (hereinafter referred to as the “Yansan D Area”);

2. Drawings indicating (1), (2), (3), (4), and (1) Part 10,293 square meters (3,113 square meters; hereinafter “the leased object of this case”) inboard (a) connected in sequence 10,293 square meters (hereinafter “the leased object of this case”) were leased as follows: “The lease deposit: 50,000,000 won per month: 4,000 won per month (excluding advance payment and value added tax separate), late payment charges: 3/100 per day at the time of delinquency in rent, the Plaintiff may terminate the lease contract.”

(hereinafter “instant lease agreement”). 2 The Plaintiff delivered the leased object of this case to B pursuant to the instant lease agreement, and the Plaintiff paid KRW 50,000,000 to the Plaintiff and attached Form on the ground of the leased object of this case after paying the lease deposit to B.

2. Attached Form, such as the indication of drawings;

1. Each of the buildings listed in paragraphs 3 through 6 of the list (hereinafter “instant building”) was newly constructed.

3. On the other hand, the plaintiff is attached to the middle part of Yangsan D area.

2. A public road with a width of about 20 meters, such as drawings, was installed. Of the foregoing roads, approximately 10 meters in width and approximately 94m in length (area 927mm in length) in length are located on the leased object of this case. B, among the leased object of this case, the leased object of this case 10,293m in size.

3. Only the portion of 9,366 square meters in the ship which connects each point of 25,26, 27.28, 29, 30, and 25 with drawings was used for profit-making;

(B) The Plaintiff and B are the tea under the instant lease agreement and KRW 4,750 per square meter from March 2014 (value added tax was increased separately, and the overdue rate based on the rent is 12% per annum.

arrow