Text
1. The plaintiff J shall dismiss the lawsuit.
2. The claims of plaintiffs A, B, C, D, E, F, G, H, I,K, L, and M are dismissed, respectively.
3. The plaintiff.
Reasons
1. Basic facts
A. On September 21, 1911, the Land Survey Division written in the Japanese Occupation Period is written as follows: (a) O (P) having the address column as of September 21, 191 was written as the Gyeonggi-gun Q 4,930; (b) R forest and fields 3,036; (c) 223; and (d) having the same day address column as the public column; and (e) O (T) having the same day address column as the Gyeonggi-gun was written as the 6,356 U. 6,356.
B. 1) Gyeonggi-gun Group No. 4,930 (hereinafter “instant one land”)
The registration of ownership was completed in the Republic of Korea on June 14, 1984, when the land category was changed and the area was converted, and the registration of ownership was completed in the Republic of Korea on June 14, 1984. 2) W forest 2,034 square meters divided from 3,036 square meters in Gyeonggi-gun, Gwangju-gun (hereinafter “instant 2 land”) was 6,724 square meters in the X-si, Hanam-si, X river 6,724 square meters after the land category was changed and the registration was completed on June 14, 1984.
3) Gyeonggi-gun-gun 223 square meters (hereinafter “instant 3 land”).
The registration of ownership preservation was completed in the Republic of Korea on June 14, 1984. 4) On August 3, 1995, the land of this case was merged into the Z river of 104,771 square meters in Hanam-si on August 3, 1995.
5) Gyeonggi-gun-gun 6,356 (Directors’s “instant 4 land”).
The registration of preservation of ownership was completed in the Republic of Korea on June 14, 1984, after the change of land category, conversion of area, etc.
On June 18, 198, the above land was divided into AA river 3,509 square meters, AB river 7,924 square meters, AC river 9,579 square meters. On February 7, 1992, AB river 7,924 square meters was divided into AB river 4,115 square meters and AD river 3,809 square meters, and on August 3, 1995, AB river 4,115 square meters, AD river 3,809 square meters was combined with AE river 31,844 square meters, and AF river 9,579 square meters, AD river 9,532 square meters.
(c) The construction division shall be transferred to the Han River Register in the Han River Maintenance Master Plan drawn up on December 12, 1978.