Text
1. The plaintiffs' claims against the defendants are all dismissed.
2. The costs of lawsuit are assessed against the plaintiffs.
Reasons
1. Basic facts
A. The Plaintiffs are sectional owners or occupants of A’s consent to an apartment-type I apartment-type factory (hereinafter “instant factory”) in Yeongdeungpo-gu, Nowon-gu, Seoul Special Metropolitan City H.
(f) At the time of the occurrence of the fire described in paragraph (1), the defense rooms owned or occupied by the Plaintiffs are as follows:
Plaintiff
Category B Co., Ltd. (hereinafter “B”) 1109 No. 1103 and 1104 (hereinafter “D”) 1206, E 1207 E 11111 (hereinafter “F”) 1202 L Co., Ltd. (hereinafter “G”) 1208
B. On November 30, 2012, the International Association of Management (hereinafter referred to as the “Representative Council”) composed of the representatives of each of the instant factories entered into a building management contract with Defendant Lone Star Co., Ltd. (hereinafter referred to as “Lone StarS”) under which the representative conference entered into a contract on the management of the instant factory building with Defendant Lone Star Co., Ltd. (hereinafter referred to as “Lone Star Co., Ltd”), and Defendant Lone Star P as the head of the instant factory management office.
C. Defendant Qz fire and marine insurance Co., Ltd. (hereinafter “Mez fire”) concluded a sales liability insurance agreement with Defendant Lone Star Co., Ltd. (hereinafter “Defendant Lone Star Co., Ltd”) with the content that Defendant Qz fire would compensate for the said damage if the liability is to be borne by a third party in relation to the instant factory management contract (from December 1, 2012 to December 1, 2013, the insurance term of which was KRW 1 billion).
On the other hand, on July 11, 2013, the representative meeting entered into a fire-fighting system inspection and fire-fighting management agency contract with respect to the factory of this case. On July 19, 2013, as a result of the inspection of the fire-fighting system of the factory of this case on July 19, 2013, the Nada industry has a phenomenon that the fire-fighting system of the factory of this case is pushed down between the primary and secondary pipelines of the factory of this case.