(영문) 의정부지방법원 2018.01.19 2016고단3103
건조물침입등
Text

The defendant is innocent. The summary of this judgment shall be notified publicly.

Reasons

The summary of the facts charged is a field director of the “C”, who is a private letter or facility business entity, and is a person who is in charge of private letter or facility works within “F” on the second floor of the Gyeonggi-si operated by the victim D, in the Government of Gyeonggi-si operated by the victim D.

1. On March 20, 2015, the Defendant: (a) obstructed the victim’s friendship or business by force for about one hour from around 14:00 to around 1, 2015, by stopping the water pumps of the above private letter, which were normally in operation with the victim in the process of normal operation, and preventing the water supply of the above private letter.

2. The Defendant intruded upon a structure with the intent to arbitrarily suspend the water pumps, such as the date and time set forth in paragraph 1, at the place set forth in paragraph 1, and entered the said door or machine room. The following facts are acknowledged according to the evidence submitted in the instant case (in particular, G’s testimony at the 10th trial date is deemed to be the most accurate and reliable evidence).

D On March 20, 2015, when the Defendant did not transfer and take over private rains or facilities that he had been subcontracted, the Defendant was provided with visitors by replacing the locking device of the entrance door of the room with the electric power to prevent the Defendant from entering the room, and by allowing G to operate the equipment at his own discretion.

G When the water pumps (supply pumps) were installed in the morning, the water supply was operated without the entry.

12:00 Water has been stored in hot water, but water leakage has occurred in some pipes around 13:00.

As a result, G took measures such as diving valves and extinguishing posters pumps, and opened a door to the equipment room, and used close work.

The Barp Operationll was located in the entrance of the equipment, and the point of the contact work was the place where the equipment was entered the direction.

The adjoining work was 16:00 square meters.

From 13:00 to 16:00, the number of people and the melting.