(영문) 수원지방법원 2016.08.23 2015가단111071
지상권확인 등 청구의 소
Text

1. The Defendant (Counterclaim Plaintiff) is also the Plaintiff (Counterclaim Defendant)’s assessment of the attached Form 1 drawings out of the area B large of 242 square meters in Suwon-si.

Reasons

1. Facts of recognition;

A. The Plaintiffs are co-owners of the building of this case with the 39 square meters, the 1317 square meters, the 52 square meters in G, the 52 square meters in G, H large scale 192 square meters, and the 192 square meters in I large scale 28 square meters (hereinafter referred to as the building site in this case) above the 3rd floor of the 3rd floor of the 3rd floor of the 3rd floor of the 1st floor of the 3rd floor of the 1st floor of the 3rd floor of the 1st floor of the 3rd floor of the 1st floor of the 1st floor of the building, the 1st 4th 2nd 2nd 971.44 2nd 2nd 971.57 square meters in the 1304.15 square meters in the 1304.15 square meters in the 1999.

B. B large 242 square meters adjacent to the instant building site (hereinafter “instant building site”) were owned by the lower court, which originally sold the instant building, and the Defendant purchased the instant land in the process of public sale on August 12, 2014.

C. After planning a construction act from 2003 and constructing the instant building, a preservation registration was completed on July 20, 2004, on which HJ large 467 square meters was owned by the subdivision to register it as a site for the instant building. On July 20, 2004, after the subdivision, HW large 192 square meters, I large 15 square meters, B large 260 square meters were divided into H large 192 square meters, B large 192 square meters and 15 square meters, and after the subdivision, the registration was made as a site for the instant building.

At the time of the registration for preservation of the instant building, a road was installed at the time of the construction of the building site in order to connect the entrance roads connected to the ground from the second floor parking lot of the instant building to the south-side road of the instant building site (the road was installed at the time when 32m road was planned to be constructed on the urban planning, and the road was installed at that time; hereinafter the same shall apply). The use of the instant building was approved.

A designer who designed the instant building was anticipated to be included in the road site of the instant building, and was not included in the building site of the instant building, and was installed and used as a parking lot for the instant building on B large B large B, 260 square meters, which is the site where the land distribution was located.