logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 성남지원 2018.05.30 2017가단19035
무상기부채납에의한 소유권이전등기말소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. F owned G forest land 659 square meters in Gwangju-si, Gyeonggi-do, but was divided into H on January 14, 201 into 317 square meters and 352 square meters in total into H, and D.

B. On March 24, 2011, in filing an application with the Mayor of Gwangju-do for a building permit including permission for development in order to construct a building on H forest 317 square meters (hereinafter “instant building site”), with the Mayor of Gwangju-si, Gwangju-si, Gwangju-do, and submitted a letter of promise of delinquency in payment to the effect that “The instant road site was divided into 90 square meters of 352 square meters of forest Do, Gwangju-si, incorporated into an urban planning road (hereinafter “instant building site”), among 352 square meters of forest Do-si, Gwangju-si, Gwangju-si, Gwangju-si, Gwangju-si, and that “the instant road site was divided into 90 square meters of forest e.g., Gyeonggi-do, Gwangju

C. On April 4, 2011, Gwangju Mayor issued a building permit (hereinafter “instant building permit”) to construct the following buildings (hereinafter “instant building”) on the instant building site. According to the implementation conditions, the Sub-section, “The instant road site incorporated into the 11. Urban Planning road shall be gratuitously reverted to Gwangju City (the submission of road packaging photographs at the time of approval for use)” was added to the Sub-section, “The instant road site incorporated into the 11. Urban Planning road shall be gratuitously reverted to Gwangju City (hereinafter “the instant sub-section”).

A new construction of a general steel structure structure with a total floor area of 56.78% of the building area of 179m2, 179.99m2, and a total floor area of 539.97m2, which is 82.18% of the floor area of 52.18% of the total floor area of 539.97m2;

D. The construction site in this case is a building with a total floor area of 179.99 square meters in neighborhood living facilities (manufacturing business) and neighborhood living facilities (retail stores) 179.99 square meters in one floor and 179.97 square meters in two floors, and an entry plan is to be opened and entered with an urban planning road (the instant road site) on the front road.

arrow