(영문) 서울남부지방법원 2017.07.07 2016가단261841
건물명도
Text

1. The Defendant (Counterclaim Plaintiff) against the Plaintiff (Counterclaim Defendant)

(a) Attached Form 139.835 square meters of the 1st floor of the building listed in the attached list.

Reasons

1. Basic facts

A. On October 14, 2015, the Defendant entered into a lease agreement with the Plaintiffs on the following: (a) part (A) of the attached map No. 3, 4, 7, 8, and 3 of the 1st floor of a building listed in the attached Table No. 139.85 square meters, which connects each point of (a) 60 square meters of the attached map No. 1, 2, 3, 4, 5, and 1 of the 2nd floor of a building listed in the attached Table No. 139.83 square meters of a building listed in the attached Table No. 1; and (b) part (b) which connects each point of (a), 65.42 square meters of the leased building (hereinafter referred to as “the leased building in this case”) with the lease deposit for a period of 40 million won, monthly rent 4,015,000 won (including value-added tax) and the lease deposit for the lease from October 29 to 24, 2015.

B. After the lease of the instant leased building, the Defendant, without permission, installed a light-frame structure on the part (C) of 10 square meters, which successively connects each point of 4,5,6,7, and 4 on the 139.85 square meters of the 1st floor of the building indicated in the separate sheet, and installed a light-frame structure on the part (D) of the same building, which connects each point of 1,2,3,8,9,000 square meters of the 1st drawing among the same buildings, with the area of 13 square meters of the 13th square meters of the board.

On October 24, 2015, in relation to the construction of the above unauthorized facilities, the Defendant agreed to the Plaintiffs on October 24, 2015 that the Defendant bears the indemnity for the above unauthorized part, and the Defendant is responsible for and responsible for the following problems.

The head of Yangcheon-gu Seoul Metropolitan Government imposed a non-performance penalty of KRW 3,946,800 on July 7, 2016, and imposed acquisition tax of KRW 506,290 on November 16, 2016.

C. Meanwhile, the Defendant’s monthly rent from October 29, 2015 to November 28, 2016 52.