logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 2014.11.27 2014가단200791
건물철거 등
Text

1.(a)

The Defendant Counterclaim Co., Ltd. (Counterclaim Defendant) shall draw up a map in attached Form A among the 925 square meters in return, Jeonbuk-gun E, Jeonbuk-gun.

Reasons

1. In full view of the overall purport of the pleadings as a result of the appraisal commission with respect to Gap's evidence Nos. 1 through 5 (including various numbers), and with respect to the land office of the headquarters of the Jeollabuk-gun, Jeollabuk-do, Jeollabuk-do, Inc., Eul-do, the Defendant owned the Plaintiff, in sequence, with the part (B) and 16 square meters (hereinafter referred to as "B") inside the ship connected each point of 9,24,21,20,19 square meters (hereinafter referred to as "the part") of the attached drawing Nos. 1 through 5 (including each number), and the part of the above building Nos. 24,25, 26, 21, and 24 (hereinafter referred to as "the above part of the building No. 5) on the ground structure of the building No. 925 square meters owned by the Plaintiff Co., Ltd., Ltd. (hereinafter referred to as "the above part of the building No. 1) and the part of the building No. 1, which is owned by the Plaintiff No. 36.

Plaintiff

C As a result of the Defendant’s possession or use of the above (f), KRW 1,00,00 as damages, and the portion from the day after the delivery of a copy of the complaint of this case to the above (f) shall be the above-mentioned building.

arrow