(영문) 울산지방법원 2015.01.16 2014가단58770
채무부존재확인
Text

1. The Defendants are the accidents involving the Plaintiff, and the vehicles of Drout season C located at the construction site located in Ulsan on July 7, 2014.

Reasons

1. Basic facts

A. around 2014, Defendant A had a business registration, which is a “mutual E and business mid-term rental” in his/her own name, and had the owner registration of D key machines (hereinafter “instant key machines”).

B. Around March 2014, the Plaintiff entered into an automatic comprehensive insurance contract with Defendant A with respect to the term of this case as shown in attached Table 1.

(hereinafter referred to as the insurance of this case). Details of the major terms and conditions applicable to the insurance contract of this case are as shown in attached Form 2.

C. (1) Around July 2014, Defendant Open Land Co., Ltd. (hereinafter “Defendant Co., Ltd”) performed concrete land construction works on the parking lot on the same side (104) parking lot relating to Ulsan located in Ulsan located.

(2) The Defendant Company entered into a use agreement with Defendant B (hereinafter “F”) on G pumps owned by it (hereinafter “this case”) and had Defendant B conduct concrete typing operations on July 15, 2014.

Defendant Company et al. tried to install and work the arche area both of the pumps of the instant case. As the ground was weak due to friendly, there was a situation where the above pumps were invaded and the above pumps were also felling.

(3) immediately after the Defendant Company requested the E office to provide crypter with crypter for the instant pumps.

(4) Nonparty H (Defendant A’s father) driven the instant climate and arrived at the site.

Defendant Company and H wanted to take a pump in a state where the flag takes the flag in the direction of the flag, and the remaining direction of the flag.

However, there was an accident involving the transfer of the aircraft in the process of the development of the equipment due to the load of the pumps, etc.

(hereinafter referred to as the “instant accident”). D.

The defendant company was working due to the accident of this case.