logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 춘천지방법원 강릉지원 2021.01.12 2020가합59
총회결의부존재
Text

1. All of the counterclaims filed by the Plaintiff (Counterclaim Defendant) and the Defendant (Counterclaim Plaintiff) shall be dismissed.

2. Due to the principal claim.

Reasons

1. Basic facts

A. On October 16, 1990, C completed the registration of transfer of ownership on the ground of one’s own sale on October 13, 1990 with respect to the land of 191m2 (hereinafter “instant land”).

B The general meeting of the church operation committee of the B church will be held at the B church located in Gangnam-si on March 10, 2003. The general meeting of the church operation committee of the B church will be held at the B church located in Gangnam-si on March 10, 2003. The general meeting of the gold-day operation committee, which was notified, is legitimate since all the five operating members are present at the meeting of the chairman at the time of the regular meeting, after inspecting the members.

After deliberation on the above bill at the time of the application for the preservation registration of the real estate building of this church, a resolution is made as follows. The Gangnam-si Office of the resolution shall apply for the preservation registration of the building of the main church of this church and shall delegate all the above authority to the representative C Jeondog of this church

Since the above-mentioned bill passed a deliberation without an objection, it was 1:30 minutes per 30 minutes per 1:00 p.m., the Speaker declared that the bill will be passed and closed.

On March 10, 2003, the representative C of the Operation Committee of B church on March 10, 2003, the F Operation Committee member of the G Operation Committee of Plaintiff (Counterclaim Defendant; hereinafter “Plaintiff”)

B. Around March 10, 2003, a “written resolution at the general assembly of the B church Steering Committee” was drawn up with the following contents.

(c)

On February 2, 2005, the registration number for real estate was assigned [the address of Defendant (Counterclaim Plaintiff (Counterclaim Plaintiff; hereinafter “Defendant”) at the time of granting the registration number for real estate registration is the same as Gangnam-si D, which is the address at the time when C was located] With respect to the general steel structure and the third floor cultural and assembly facilities (hereinafter “instant building”) on the ground of the instant land, the building permission was issued on October 23, 200 and the commencement on December 13, 2000. After obtaining the approval for the use of the building on November 5, 2004, the building registration number was issued, and the building registration was received on February 28, 2005 under C’s name.

arrow