logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2020.08.21 2018가단5233986
구상금
Text

1. The Defendants jointly share KRW 21,350,465 with respect to the Plaintiff and the period from November 25, 2017 to August 21, 2020.

Reasons

1. Facts of recognition;

A. D concluded a lease agreement on the instant building with F, the owner of the E-owned building (hereinafter “instant building”) in Namyang-si, Namyang-si, and thereafter concluded a sub-lease agreement with G and Defendant B on part of the instant building.

B. The instant building was located in the “H” store (total floor area) operated by G from the left-hand side, the “I” store (total floor area of 265 square meters) operated by D, and the “J” store operated by Defendant B (total floor area of 130.75 square meters; hereinafter “instant store”) when viewing the entire part of the building as a single-story building with a total floor area of 464 square meters, respectively.

(other section for common use 24.25 square meters).

The Plaintiff entered into a general fire insurance contract (hereinafter “instant fire insurance contract”) with D, the insurance period from March 31, 2017 to March 16:00, 2018; the instant building, facilities within the instant building, office fixtures, machinery, and inventory assets, which cover fire damage, etc. (hereinafter “instant fire insurance contract”).

On April 27, 2017, at around 01:29, fire occurred in the instant store, and the instant building, including the instant store, and the D-owned facilities, equipment fixtures, machinery, inventory assets, etc., which were operated as “I” in part of the instant building, have occurred.

(hereinafter “instant fire”). E.

The details of the report on investigation regarding the fire of this case are as follows.

1 Gyeonggi Northern Provincial Police Agency’s Scientific Investigation Agency’s review of the results of a fire site identification at the scene of the fire and the field of investigation are the shape that has been burned inside and outside of the warehouse of the dunes in the left-hand side of the J to the I. The location of the heat-free machine referring to the drawing of the guard company - The location of the heat-free machine referring to the drawing of the “J” is the same as the “J”, and according to the signal list of the guard company, the five alarm of the “J” on April 27, 2017 : 01:24:07, and the two alarm of the head of the work after the operation at the second 01:51.

arrow