(영문) 서울중앙지방법원 2011.09.15 2010가단144405
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On July 3, 2006, the Plaintiff: (a) on the ground A, B, C, and D of Ilyang-si, Manyang-si, Manyang-si; (b) Dong, C, and D, respectively.

(c) and (e);

From the same insurance period to July 3, 201, the insurance company entered into an unlimited dividend comprehensive insurance contract with Dong as the insurance object from the same insurance period to July 3, 2011.

In addition, on June 22, 2007, the Plaintiff entered into an unlimited dividend comprehensive insurance contract with E as of June 22, 2012 from the day on which the insurance period for the goods/ semi-finished goods located in Il-dong-gu B as an insurance object.

B. On August 20, 2007, the Defendant leased the above B, C’s ground sand site location plate building 396 square meters (hereinafter “instant warehouse”) and the annexed land at KRW 30,000 for 24 months from September 3, 2007, deposit amount of KRW 30,000,000, monthly rent of KRW 3,250,000, and on September 3, 2009, the above contract was renewed by increasing the rent of KRW 3,00,000.

C. On December 18, 2009, at around 09:25, a fire occurred from the right-hand side of the entrance of the warehouse of this case, and the warehouse of this case and the next side thereof.

The warehouse and the F's clothes, etc. kept in the warehouse, were damaged by the total loss.

(hereinafter “instant fire”). D.

At the time of the instant fire, plastic mortar was loaded in front of the entrance of the instant warehouse at a distance presumed 30 to 70 cm away from the building and at the time of the instant fire, to transport bread. In light of the warehouse and the entrance of the warehouse of this case, it is located on the left side.

Among the building, there was a tin-open box where the employees of the defendant company had a fire for heating purposes.

E. On December 19, 2009, the Gyeonggi Gyeonggi Police Station stated, “The cause of the fire is emitted from the soft system and the front part of the logistics warehouse, and two dynamics, such as the assembly-type board, which are moved to a storage of the Internet, are completely broken off.” The investigation report of the same police station is presumed to be around the right side wall of the warehouse (e.g., the combustion board) and the reason for severe combustion and combustion in the same part.