(영문) 수원지방법원성남지원 2020.12.16 2019가단212265 (1)
건물등철거
Text

The Defendant, as the Plaintiff

A. Of the area of 309 square meters prior to Gwangju City, each point of the attached Form No. 1, 2, 3, 4, and 1 is linked in sequence.

Reasons

1. Determination on the cause of the claim

A. 1) The Plaintiff is the Plaintiff’s land of this case D and E with 309 square meters and 91 square meters (hereinafter “each land”) before Gwangju-si, Gyeonggi-do.

The Defendant is the owner of the instant land and the Defendant is 708 square meters and G 88 square meters (hereinafter “instant F and G land”). The Defendant is 708 square meters and G land adjacent to the instant land and the instant land.

2) On the ground of the instant F land, there is a boiler room built by the Defendant (hereinafter “Defendant boiler room”), and there is a house owned by the Defendant on the G land of the instant G (hereinafter “Defendant Housing”).

① Of the Defendant’s boiler room, the part 6m2 (hereinafter “the part of the boiler room”) of the instant case, which connects each point of 1,2,3,4, and 1 each point of 1,2,3,4, and 6m2 (hereinafter “the instant part of the boiler room”) was invaded on the instant land. ② The part of the instant building part of the instant building, which connected each point of 5,6,7,8, and5 in sequence, among the Defendant’s housing, intrudes on the instant land; ③ among the Defendant’s housing, the part of the instant building part of the instant building was 1m2 (hereinafter “the instant building part”), which connects each point of 8,7,9,10,15,14, and 8, the part of the instant building, which was 6m2 (hereinafter “the instant building part”), connected each point of 13,14,150,100,000 in sequence, indicated the instant D and the land attached to the instant case.

3) The amount equivalent to the instant boiler part, the instant building part, the instant building part, the instant building part, and the rent from June 1, 2009 to January 31, 2020 (in the instant boiler part, the total amount equivalent to the rent from January 1, 2012 to January 31, 2020, the said construction date, is KRW 6,006,240, and the amount equivalent to the rent from the boiler part from February 1, 2020, the amount equivalent to the rent from the instant boiler part, KRW 15,240, and the amount equivalent to the rent from the instant building part, KRW 3,720, and the rent from the instant part of the building.