(영문) 대전지방법원홍성지원 2017.11.15 2016가단12380
손해배상(기)
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

In light of the above legal principles, the court below’s determination is justifiable. It is so decided as per Disposition by the assent of all participating Justices on the bench, as per Disposition by the assent of all participating Justices, as per Disposition by the assent of all participating Justices on the bench, as per Disposition by the assent of all participating Justices, as per Disposition by the assent of all participating Justices.

1. The defendant shall faithfully implement the following conditions on the premise that the plaintiff may entrust the industrial wastes of the stone complex occupant factories with the disposal of the industrial wastes without compensation during the construction period of the relevant section.

The rock sand (fluorite and light rock) generated in east on the site shall be treated as the whole as a condition for the receipt of a letter of order for the designation of a sand site, and shall cooperate to the maximum extent possible with the defendant in the designation of a sand site and in the case of cancer.

The entire quantity of industrial wastes (in the case of changing the design, the changed design shall be the standard) generated from the reduction of the reduction of the middle opening unit of △△ shall be entrusted to the plaintiff.

* The terms and conditions of waste disposal C implementation (except in the case of separate order contracts) * the entrusted unit price shall be on the basis of the agreed unit price.

The transportation equipment of soil that passes through the premises of the stone complex in the relevant section shall use two plaintiffs' president's expenses until the completion of the soil work in the relevant section.

*Provided, That the unit price agreement with the tunnel implementing entity and the terms and conditions of implementation of the agreement on the use of roads for stone complexes

2. After the agreement, the Plaintiff does not raise any civil or criminal complaints with respect to all matters pertaining to this case, and actively cooperates with the Defendant to smoothly proceed with the execution of the construction work upon the conclusion of the agreement.

5. The defendant is fully responsible for all the plaintiff's civil and criminal damages resulting from the failure to perform the above agreement.

From the end of 2015 to the construction site of D tunnels, approximately 44,00 cubic meters of soil was generated, and the soil volume generated therefrom was mobilized from February 2, 2016 to September 6, 2016 and carried out of 11 cubic meters of soil volume.

[Ground of recognition] Unsatisfy, Gap, 1.