(영문) 수원지방법원 성남지원 2018.01.16 2017가합400829
시설물 철거
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. Eight stock companies, including the Plaintiffs, U.S.T.T.T.T.T.T.T.T.T.T.T. H.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.P.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.T.R.D...........D.........................

B. Since then, as a result of arranging the shares in each of the above parcels, the plaintiffs, Lee Dong-dong, and Lee Dong-dong, were to own three parcels of the above six parcels of the F 1,316.9 square meters in Seongbuk-gu, Sungnam-si, G 1,459 square meters in 1,456 square meters in 1,456 square meters in 1,456 square meters in 1,50 square meters in 1,50 square meters in 1,545 square meters in 1,545 square meters in Y-gu, Sungnam-si, Sungnam-si, and the land in this case was jointly owned by the plaintiffs, Lee Dong-dong, and Lee Dong-dong in 1,545 square meters in 1,000 in 2.

Plaintiff A (hereinafter referred to as “Plaintiff A”)

(2) Equity shares: 203217/66450, Plaintiff B Co., Ltd. (hereinafter “Plaintiff B”).

c) Equity: 186728/66450; 71470/66450; 7147/66450; 205035/66450) equity;

around October 2014, the Plaintiffs, ASEAN, and Switzerland were to construct and obtain approval for use of the D Building, L Building, and the instant building on the ground of the said six lots including the instant site. D building owned by the sponsian, L building owned by the Plaintiff B, and the instant building owned by the Plaintiffs and ASEAN. The instant building was jointly owned by the Plaintiffs and ASEAN.

Plaintiff

A Equity 44.04%, Plaintiff B’s Equity 40.47%, .