logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2017.01.13 2014가합69675
추심금
Text

1. The Defendant’s KRW 62,278,216 as well as 5% per annum from October 14, 2014 to January 13, 2017 to the Plaintiff.

Reasons

1. Basic facts

A. C Co., Ltd. (hereinafter “C”)

(2) On June 9, 2013, the Defendant and the Gyeonggi-do Suwon-si District D’s ground leveling to the size of the first and fifth floors above ground level on the ground level (hereinafter “instant Notice Board”).

) New construction works (hereinafter “instant construction works”)

) The contract for construction works was entered into (hereinafter “instant contract”).

The main contents are as follows. The date of commencement: The amount of contract on April 30, 2014: the contract amount: 1,620,000,000,000), and the amount of non-value-added tax separately: The amount of non-added tax paid in advance: The amount of non-value-added tax paid in advance: The amount of non-value-added tax shall be based on the new report standards (the rate of liquidated damages for delay: the amount paid in advance at the time of completion of 1/100 a day: the amount paid in advance at the time of completion of 1/100 a day, the amount of water

1.The contract shall be for the total sum of KRW 1,620,000 in full.

3. The scope of construction work shall include civil engineering, aggregates, internal storages, external storages, and internal facilities (intestines, washing machines, washing machines, cooling machines, e-mails, straws, kitchens, fish containers, etc.). The scope of construction work shall be limited to KRW 1,300,00 per day, and the construction work shall be limited to KRW 320,00 per day after completion of the construction work of the first floor (the second floor).

The current design drawings shall be based on the current design drawings, and if the exterior and internal design are new, it shall be constructed with a new drawing without changing the amount.

The basis of household appliances, such as interior facility furniture, laundry, cooling, air container, personal tampon, electronic rail, and sculd, etc. is Samsung.

The interior and exterior materials shall be consulted with the project owner, and shall be designated by the project owner.

2. The instant public official was designed to design the first first floor to the office, and the second to the 5th floor to the 11st room by each floor. While entering into the instant contract, C and the Defendant, upon completion of the construction work in accordance with the said design drawing, and completion of the construction work in relation to the part of the first floor to the 1st floor for the purpose of the 2 to the 5th floor.

arrow