(영문) 서울중앙지방법원 2018.12.05 2016가단5232323
구상금
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On June 14, 2013, Defendant Co., Ltd. Co., Ltd. (hereinafter “Defendant Co., Ltd.”) concluded an automobile insurance contract with Defendant B with regard to the C business-based individual scamboos (hereinafter “instant scamboos”).

Defendant A is a driver of the instant digging machine.

B. The gold Industry Co., Ltd. (hereinafter “gold Industry”) contracted the D Construction and subcontracted the E Construction to the Taesung Construction Co., Ltd. in the course of performing the D Construction.

F, who is an employee of the construction site of Masung Construction Co., Ltd. (hereinafter referred to as “the construction site of this case”), worked as the head of the Working Group at the construction site of the above sewage pipe (hereinafter referred to as “the construction site of this case”).

The gold industry becomes a policyholder of the Industrial Accident Compensation Insurance Act (hereinafter referred to as the "Industrial Accident Compensation Insurance Act") pursuant to Articles 5(3) and 9(1) of the Act on the Collection of Insurance Premiums, etc. for Employment Insurance and Industrial Accident Compensation Insurance as the original beneficiary of the said sewage pipeline.

C. The gold-free industry leased from Defendant B the instant excavation searcher and Defendant A, a driver thereof, to enter the construction site of this case. Defendant A operated the instant excavation searcher according to the direction of the victim’s work.

Defendant A moved about 15 meters from the steel plate connected to the slvet to the slve to the slveet in accordance with the recipient's reception, and then, Defendant A moved about 15 meters from the steel plate to the slved installation point, set one side of the steel plate on the floor, and continuously laid down the opposite side into the slve ballast.

In addition, on October 16, 2013, the victim was engaged in the work of installing cream at a location to set the opposite side. However, on October 16, 2013, around 07:30, the singke was cut and the steel plate was reduced to the floor, and accordingly, the victim suffered an injury, such as the parts on the left side and the single of the single, 2, 3, 4, 5 metrifies on the left side, and the single of the 1st part on the left side.

(hereinafter “instant accident”). D.

The Plaintiff is engaged in the instant accident.